
AAI Engineering provided construction
engineering services to the general contractor
for the new Interactive Learning Center
located on the Boise State Campus. AAI’s
primary scope was to ensure adequate strength
and stability during the construction of
the 5-level post-tensioned concrete structure.
Work included analysis of the structural
member’s early cure strength, the
design of steel shoring posts, various
footings, reshoring through-out to coordinate
with the executed construction sequencing,
and temporary bracing of the concrete shear
walls.



